  • Who establishes the Substantial Completion date?
  • Correction Period: Typically how long is the period?
  • Addenda serve to do what?
  • Which statement best defines Inspection in this context?
  • Which instrument involves assuming legal liability of one party by another?
  • Which GreenFormat section would cover Product Life Cycle information?
  • The BEES model life cycle analysis is primarily described as what type of assessment?
  • Environmental performance assessment in sustainable design is evaluated at which level(s)?
  • What term denotes the maximum limit of liability payable?
  • What is an Informational Submittal?
  • What mood is recommended for use in specifications?
  • Which of the following is NOT listed as a pricing category?
  • Earthwork and related topics in Site and Infrastructure Subgroup are in which section range?
  • Which pairing is shown as correct in the material?
  • In Part 2 - Products, which term is explicitly associated with quality control?
  • Which term refers to a contract element that must, in many cases, be memorialized in writing?
  • What two aspects constitute the dual nature of design?
  • An Alternate in project scope is best described as?
  • Project Record Document includes which items?
  • In the UniFormat examples, what does the code B30 correspond to?
  • In the Facility Life Cycle, which stage follows Design and precedes Procurement?
  • Which statement best aligns with a Business Information Model?
  • A Proposal is best described as which of the following?
  • Which document is typically used to provide a cost breakdown by value and is prepared by the Contractor?
  • Which division handles Specialties?
  • Where are substitution procedures specified?
  • Process Equipment Subgroup covers which sections?
  • What term describes the cause of a loss, such as fire, windstorm, or explosion?
  • What are the two phases of the Design stage?
  • The section titled Part 3 - Execution describes what?
  • The Energy Star program administered by the EPA serves what primary purpose?
  • The BEES model life cycle analysis includes estimates of cumulative environmental impacts over all stages of a product life cycle over what period?
  • Trade Customs may be relied upon by a court when what occurs?
  • Value Analysis is also known as which term?
  • In Post-Final Completion, what actions may the Owner take?
  • Record drawings are
  • Construction Documents include two major types of documents. What are they?
  • Unit Price is defined as?
  • Which term best describes a portion of work priced separately to provide an owner option?
  • Fire Suppression and HVAC are part of which Subgroup?
  • Autonomy to Contract means what?
  • Which term describes a uniform classification system used to organize preliminary construction information by systems or assemblies?
  • What is the primary mandate of the Authorities Having Jurisdiction (AHJ)?
  • Which items are typically included in an Action Submittal?
  • Substitutions should not be considered when the request is an RFI.
  • Which item is listed under the Facility Construction Subgroup?
  • Which term should be avoided in Specification Text as per the material?
  • Which clause in contract documents ensures that representations, indemnifications, warranties, and guarantees survive after termination?
  • Which phrases should be avoided in Specification Text?
  • The National CAD Standard is associated with which drawing system?
  • Cost Estimate Techniques include which of the following?
  • Nonscaled views include which items?
  • Which event commonly triggers a change in contract price or contract time?
  • Which drawing type is prepared by manufacturers, suppliers, subcontractors, and contractors to illustrate a portion of the work and is not a contract drawing?
  • Which item described in procurement information is not contract documents?
  • What does a Payment Bond guarantee?
  • If unresolved claims escalate, what is a common next step?
  • Which term refers to insurance for loss or damage to a building under construction?
  • After Final Completion, what is the status of the contract?
  • In the project process, which role must continually inspect the work to ensure each portion is ready for the next phase?
  • Final Payment is made after which milestone?
  • A Drawing is defined as which of the following?
  • Which statement about life cycle costs is accurate?
  • Which statement best describes the Owner's role during Construction?
  • What describes a Project Schedule?
  • What best defines contract drawings?
  • Which of the following is a construction bond type listed in the material?
  • An owner claim occurs when the owner believes value of work is not commensurate with contract price.
  • Who prepares the Schedule of Values?
  • Which policy is a broad form of business insurance excluding automobiles?
  • Field Orders are associated with which organization in the material?
  • Division 10 handles which category?
  • Which section range within the Site and Infrastructure Subgroup is reserved?
  • What is the primary purpose of record drawings?
  • Termination by Owner for Cause results in what outcome?
  • Which team furnishes the materials and products for the facility to be constructed?
  • Which item is included in the Project Identification section?
  • AIA is associated with which document type in the material?
  • During occupancy, which entities maintain and evaluate the project performance and determine suitability for continuing use?
  • BEES is a design tool used for building products and is developed by which agency?
  • Which best defines Quality Assurance?
  • Which item is explicitly identified as a UniFormat example in the material?
  • Resolving Claims: Who ensures it is clearly documented and often generates a written summary response with proposed scheduling for resolving?
  • Contract Documents include all items except which?
  • Which items are typically included in Soft Costs?
  • Document Relationships indicate Construction Documents are described as including which of the following?
  • Construction Drawings consist of which of the following?
  • Cost Estimate is?
  • Which best describes Total Project Commissioning?
  • Which GreenFormat section would contain Manufacturer Sustainability Policies?
  • The 50-division MasterFormat is primarily used for which purposes?
  • In insurance terms, which right allows recovery from the liable party after payment of a claim?
  • What is the primary use of UniFormat as illustrated by the examples?
  • UniFormat is a uniform classification system used to organize preliminary construction information on the basis of what?
  • In the Facility Life Cycle, which stage follows Procurement?
  • Resource Drawings are used to show construction that is related to the work but is not indicated in the contract.
  • Which group name is part of MasterFormat Groups and specifically relates to procurement and contracting requirements?
  • Which factors are considered when determining the Project Delivery method?
  • Minor Changes in Work
  • Which project delivery concept is described by 'Fast Track'?
  • Contract Requirements include which items?
  • Who is primarily responsible for project site safety according to the material?
  • Addenda Format covers changes to which items?
  • Which contract element denotes the meeting of the minds on terms?
  • Which coverage provides protection for both bodily injury and property damage?
  • Final Payment refers to what process in a contract?
  • A submittal is defined as:
  • Under Fast Track, what construction approach is described?
  • Which condition justifies Withholding Payments?
  • In Procurement (Bidding/Negotiating/Purchasing), what results in award of a contract?
  • Which term best describes all work ceasing with the contractor not being paid?
  • Procurement - Available Information means?
  • Division 01 - General Requirements covers which of the following?
  • Procurement Documents include all procurement-related items except which?
  • Which two bonds are designed to guarantee both performance and payment?
  • Which insurance indemnifies a person with an interest in physical property?
  • Part 2 - Products describes what?
  • Which term describes documentation that shows construction-related information not indicated in the contract?
  • What are Hard Costs?
  • How is a Lien best described in construction contracts?
  • What is the primary purpose of GreenFormat?
  • Which part covers installation or application?
  • Which item is listed as part of Preconstruction Submittals?
  • Which method is used to prepare the Construction Budget?
  • How is the Facility Life Cycle defined?
  • Liquidated damages are typically described as what concept?
  • Who initiates a project, assumes risk, and provides funding?
  • Which statement describes merchantability?
  • Scaled views include which items?
  • In Schematic Design, which elements are established?
  • Alternates are best described as which of the following?
  • What is the Broad Level 1 designation for Masonry?
  • A lien is best defined as:
  • Which term means to perceive, notice, see?
  • Final Completion is achieved when which conditions are met?
  • Which statement best differentiates a Bid from a Proposal?
  • Which guide outlines phases including Conceptualization, Criteria Design, Detailed Design, and Implementation Document?
  • How is Construction defined in this context?
  • What does a Bid Bond protect against?
  • What is the primary function of the Conditions of the Contract?
  • Which are the two methods for preparing written changes?
  • What is the purpose of a Final Change Order?
  • Assignment occurs when one party legally assigns their role and responsibilities to a third party (per AIA General Conditions).
  • Unit Prices are used for which purpose?
  • BEES is used to evaluate what aspect of building products?
  • The statement 'Contractor must continually inspect work to ensure each portion is ready for the subsequent portion' best describes which practice?
  • Which section would most likely include submittals?
  • Which item is not listed as part of the Project Record Document?
  • Substantial Completion is best described as which of the following?
  • For contractor entitlement, what are the two determinations?
  • Under which subgroup do Existing Conditions, Masonry, Metals, and related topics fall?
  • What is the Medium Level 2 designation for Unit Masonry?
  • What is a Dispute as defined in the material?
  • Contract Document Modifications include which items?
  • Which of the following is NOT true about Addenda?
  • What is the purpose of Supplementary Conditions?
  • What is PageFormat?
  • Division 01 General Requirements relate to other divisions how?
  • Which term is defined as to examine carefully and for defects?
  • Remedy for Breach is an element of a contract. Which option is the correct label?
  • Instructions for Procurement describe what?
  • Which description best matches Preliminary Project Description?
  • In scaled views, which statement about Detail is correct?
  • What is a primary purpose of liquidated damages in a construction contract?
  • During Construction, who is responsible for project coordination and compliance with project documents?
  • Facility programming considers which four aspects?
  • Which of the following is one of the Six Project Delivery Methods?
  • Which term refers to the broad protection across different policies, not tied to a single line of coverage?
  • Which statement best describes the phrase 'Estimate is not a price'?
  • Invitation to Bid describes which?
  • Which statement about record drawings is true?
  • Which type of policy comprises a variety of policies providing broad protection?
  • Which entity determines Substantial and Final Completion?
  • Which division is associated with Special Construction?
  • Which statement best describes a Successful Project?
  • The Leadership in Energy and Environmental Design (LEED) certification is administered by which organization?
  • Which best defines Quality Control in construction documentation context?
  • Procurement Requirements include which elements?
  • Who is obligated for correction and warranty during Post-Final Completion?
  • How is the Project Budget different from the Construction Budget?
  • What is the focus of Design Development?
  • Section 04 21 13.13 covers which material?
  • Which party is responsible for construction administration, evaluation services, certifying applications for payment, and final inspection of work?
  • Which of the following defines a Claim in this context?
  • Which option best defines a Project Budget?
  • What is a surety bond?
  • Which items survive final payment, completion, acceptance of work, and termination?
  • MasterFormat is best known for what organizational structure?
  • What are the deliverables of Schematic Design?
  • Which of the following best describes what drawings show in construction documents?
  • Which term describes insurance specifically for a construction project to cover the building under construction?
  • Which are the two implied warranties mentioned?
  • Advertisement to Bid is defined as?
  • Which contract document binds the signing parties to the work?
  • What term describes the overall process from concept through deconstruction?
  • SectionFormat organizes specification information into which three primary parts?
  • Which drawing type illustrates objects as they appear to the eye, with reference to distance and depth?
  • Capacity is an element of a contract. Which option best identifies it?
  • Which approach is used to prepare the Construction Budget according to the material?
  • OmniClass is best described as which of the following?
  • Post Occupancy Evaluation is conducted by which role and when after occupancy?
  • What does 'Furnished by the Owner' refer to?
  • The Execution section includes which action?
  • Construction Change Directive is
  • What is a Hold-Harmless Agreement?
  • During the correction period, what remains in place?
  • Which of the following is NOT listed as an element of a contract?
  • The implied warranties referenced include merchantability and fitness for a particular purpose. Which statement best reflects this?
  • Which statement best describes the relationship between Hard Costs and Soft Costs?
  • In a Bid Form, Acknowledgements typically capture what?
  • What do Periodic Progress Payments not indicate?
  • Change Order is
  • AIA instruments of change include which items?
  • What is an Action Submittal?
  • EJCDC is associated with which document type in the material?
  • Bid evaluation is conducted per procedures set forth in which document?
  • Which activities are included in Project Conception?
  • GreenFormat provides a standard format for identifying and organizing the reporting of sustainability features of products and works in conjunction with which master standard?
  • Which concept involves restoring a victim of loss by payment, repair, or replacement?
  • Green Buildings aim to do what?
  • Which contract element represents honesty and fair dealing in performance?
  • Which statement describes Total Project Commissioning's status during construction?
  • Combined bids refer to which concept?
  • How do contract drawings differ from record drawings?
  • Building Systems Commissioning becomes involved at what stage of the project?
  • Which contract element involves the formalization of the agreement with the parties’ signatures?
  • Which team is responsible for constructing the facility and coordinating labor, subcontractors, and suppliers?
  • Which drawing type shows horizontal and vertical surfaces foreshadowed in all three dimensions, not in perspective?
  • Which party is responsible for paying taxes in the contract?
  • Who is responsible for protecting public health, safety and welfare?
  • Which term means to restore the victim of a loss by payment, repair, or replacement?
  • Who must adhere to the contractor's safety rules on the site?
  • Which deliverables are included in Design Development?
  • Which term means the right to recover from one legally liable?
  • Which document type is paired with AIA according to the material?
  • Suspension by Owner for Convenience typically results in changes to what?
  • Who bears the responsibility for paying taxes?
  • During which phase may the Owner file claims for latent defects?
  • Division 13 is associated with which construction category?
  • In the Bid Form, what does the Closing section address?
  • Sustainable Design focuses on the environmental performance of the facility over its life cycle, and this assessment takes place at what level?
  • Termination by Owner for Convenience typically results in what compensation to the contractor?
  • What is an Express Warranty?
  • Facility Services Subgroup covers which section range?
  • Termination by Contractor for Cause occurs under which condition?
  • Contractor has limited authority to stop work under which condition?
  • Life Cycle Costs include which elements?
  • Which party is responsible for producing procurement and construction documents and administering the construction contract?
  • Which UniFormat code relates to Roofing?
  • Indemnity in contract law means to:
  • Testing reports are typically included in which type of submittal?
  • What is an Allowance?
  • Cash Allowance is?
  • Which UniFormat code corresponds to Exterior Doors?
  • Which section range is reserved within the Facility Construction Subgroup?
  • Which statement best describes General Conditions in construction documents?
  • What does the Uniform Commercial Code govern?
  • Which organization is associated with Supplemental Instructions in the material?
  • What do Specifications define?
  • Which term best describes Tangible components such as site work, construction, furniture, furnishings, and equipment?
  • A Bid is best described as which of the following?
  • Which topic is included in Part 1 - General?
  • A contractor claim arises when conditions are what?
  • Shop Drawings are prepared by which entities?
  • Who has the authority to stop work without cause?
  • Which item is commonly classified as a Soft Cost?
  • What is the purpose of Retainage?